Mooring Dolphin Anchor Drilling

Pacific Demolition Ltd. contracted to drill mooring anchors to a depth of 5 m in existing concrete to facilitate the installation of a new mooring dolphin on Annacis Island.

Our experienced crew completed the precision drilling associated with this project using the latest in hydraulic core drilling technology. The core drill was carefully positioned to the exact angle required for each hole and progress was constantly monitored throughout the drilling process.

Key Project Information

  • Project Type:
  • Client:
    Fraser River Pile & Dredge Inc.
  • Location:
    Delta, BC