Conveyor System - Upgrades

Neptune Bulk Terminals awarded LNS the contract of upgrading their conveying system in order to increase the capacity of their rail-car loading and material transfer stations to 6,000 tons per hour. This project involved installation of underground conveyor pits, overhead conveyors and a new stainless steel surge bin. LNS worked closely with Neptune Bulk Terminals and its partners to develop a methodology that allowed the terminal to remain operational as much as possible during construction.

Key Project Information

  • Project Type:
  • Client:
    Neptune Bulk Terminals