WCMRC Dock

Western Canada Marine Response Corporation (WCMRC) awarded BEL Contracting the project to develop a Spill Response Base at 2800 Commissioner Street in Vancouver, BC. This project was closely linked with the Commissioner Street Road Realignment (CSRR) project, presenting unique coordination and logistical challenges.

Key Project Information

  • Project Type:
    Heavy Civil
    Underground Utilities
  • Budget:
    $6M
  • Timeline:
    Completed July 2021
  • Client:
    WCMRC
  • Location:
    Vancouver, BC

Scope of Work

BEL Contracting managed multiple aspects of the project, including:

  • Demolition: Removal of the wharf deck.
  • Earthworks: Clearing, grubbing, sub-grade excavation, and backfilling.
  • Concrete Repairs: Abutment beam, security gate, and lock block retaining walls.
  • Marine Works: Barge-related tasks.
  • Electrical Works: Installation and upgrades.
  • Civil Works:
    • Storm water drainage system with stormceptor and oil interceptor.
    • Sewerage pump-out on float and rising main to shore.
    • Onshore sewerage pump station and sewerage collection for the office building, connecting to the GVRD sewer trunk main manhole.
    • Water supply to the building and floats.
    • Dry firewater main installation.
    • Asphalt paving for the wharf, ramp, and parking area.
    • Plumbing and sewerage hookups to the office building.
    • Cobble growing medium to enhance bull kelp bed growth.

Challenges & Solutions

The overlap between the Spill Response Base and the CSRR project required meticulous planning to manage space constraints and scheduling conflicts. BEL Contracting’s role as the contractor for both projects streamlined coordination, ensuring efficient communication and problem-solving.

Overall Impact

Completed in July 2021, this $6 million project enhanced WCMRC’s operational capacity in Vancouver, ensuring readiness for spill response with improved infrastructure and utilities.