Mark Creek Flume Management & Stream Rehabilitation

The project included; removal and disposal of 300 lineal metres of existing reinforced concrete flume and four bridges; design, construct and maintain temporary system to bypass creek flows around the site and construct rock stack walls, habitat features and concrete channel and wing walls, including shotcrete slop protection for excavations abutting existing structures.

Key Project Information

  • Project Type:
  • Budget:
    $3.3M
  • Timeline:
    Completed January 2016
  • Client:
    City of Kimberley