Glacier Blasting & Shoring was contracted to replace a pipeline washed out in the 2013 flooding. The project faced challenging terrain with a 37-degree slope, making drilling and loading difficult. To overcome this, a dozer was placed on top of the hill, attached with winch lines to support the drill rigs. Despite these tough conditions, the project was completed successfully without any safety incidents, and consistent ditching was achieved.