Inbound Conveying System - Supply & Installation
Kinder Morgan awarded LNS the contract to upgrade their in-bound conveying system in order to allow ship loading and unloading to occur at the same time. This project involved removal of an existing dock conveyer, modifications to their existing ship unloader and installation of a new dock conveyor. LNS worked closely with Kinder Morgan at all stages of the project to ensure they could remain an operational terminal during construction.