Lulu Island - Swing Bridge Motor Replacement
LNS was awarded the design-build contract to replace the Lulu Island Swing Bridge Slew Motor. The scope included the inspection of the existing mechanical system, re-design, supply and installation of a new slew drive motor arrangement.
Key Project Information
- Project Type:
- Client:Ross Morrison Electric
- Location:Richmond, BC