Galloway Passing Lane
The project included; quality management, traffic management, survey layout, clearing and grubbing, organic striping, profile milling, pavement removal, type “D” roadway and drainage excavation and surcharge removal; supply and place granular material, supply and install culverts, supply and install primer and tack coat, supply and place asphalt pavement; class 1 (16mm) medium mix, level course, asphalt bottom lift, asphalt middle lift, asphalt top lift, remove concrete roadside barriers (CRB), remove and dispose of existing signs, culverts and catch basins; supply and install new signs and posts, shouldering, site restoration, removal, supply, and installation of fencing, and clean-up.
Key Project Information
- Project Type:
- Budget:$3.1M
- Timeline:Completed July 2017
- Client:Ministry of Transportation and Infrastructure