Little Sand Creek Bridge Replacement
The project included; the removal of an existing highway bridge and pedestrian bridge; provision of a temporary highway bridge and bypass; new bridge construction and cast-in-place concrete; pre-stressed concrete stringers, grading, roadway and drainage excavation; clearing and grubbing; paving, roadside barrier, pavement marking, site restoration and landscaping, and in-stream placement of riprap and sediment control.
Key Project Information
- Project Type:
- Budget:$2.8M
- Timeline:Completed August 2014
- Client:Ministry of Transportation and Infrastructure