Pandora Co-Live

Located at the corner of Pandora Avenue and Vancouver Street, this first-of-its-kind offering will feature co-living suites alongside 1 and 2-bedroom rental homes. Western Grater began the Pandora project called the Co-Live in June of 2022 by drilling soldier piles for shoring and began Shotcrete shoring and excavation in November of 2022.  Following a new-to-us design provided by Geo-Pacific engineering, H-Piles coupled with an I-beam whaler were used in conjunction with evo tie back anchors WGC was able to complete this project in record time.

Key Project Information

  • Project Type:
  • Budget:
    $3.3M
  • Timeline:
    June 2022 - June 2023
  • Client:
    Townline
  • Location:
    Victoria, BC

Scope of work

The Pandora project consisted of multiple scopes of work for western grater including blasting, shotcrete shoring and tie-back anchors.  The shotcrete shoring system consisted of H piles drilled in from the surface, horizontal whaler beams and tie-back anchors to further support the vertical shotcrete wall. Traditional blasting methods were used to complete excavation to the desired depth.