Columbia Avenue Phase 2

Columbia Avenue Phase 2

  • 8 January 20258 January 2025
  • by Kaelan

Scope of Work

Key components of the project included:

  • Replacing and upgrading deep utilities, including water and storm sewer systems.
  • Full highway reconstruction to improve road durability and safety.
  • Constructing two retaining walls to support new grades and enhance stability.
  • Installing concrete sidewalks, complete with site furnishings for public use.
  • Boulevard landscaping, including the addition of street trees to improve the urban environment.
  • Miscellaneous electrical upgrades and relocations to modernize street lighting and utilities.

Challenges & Solutions

  • Utility Coordination: Upgrading water and storm sewer utilities required careful coordination to minimize disruptions to residents and businesses. Copcan implemented phased construction plans to maintain access and utility service throughout the project.
  • Retaining Wall Construction: Building retaining walls in constrained urban spaces demands precision and efficient use of materials. Copcan leveraged advanced construction techniques to meet design standards while adhering to tight timelines.
  • Community Impact: Enhancing a major corridor while minimizing disruption to traffic and local businesses was a key challenge. Traffic management plans and proactive communication with stakeholders ensured the project progressed smoothly.

Overall Impact

The Columbia Avenue Complete Streets project delivered lasting benefits to the City of Castlegar. The upgrades improved essential infrastructure reliability, enhanced roadway safety, and added modern pedestrian and cyclist amenities. With thoughtful landscaping and public furnishings, the project also contributed to the area’s aesthetic appeal and urban livability, making Columbia Avenue a more inviting and functional space for the community.

YCG Taxiway and Apron Rehabilitation

YCG Taxiway and Apron Rehabilitation

  • 8 January 20258 January 2025
  • by Kaelan

Scope of Work:

  • Construction of a new apron expansion area, including excavation, granular sub-base course (GSBC), granular base course (GBC), and asphalt paving.
  • Installation of 6 new concrete panels and a surrounding transition slab.
  • Removal and replacement of trench drains.
  • 60mm mill/pave of the existing apron with new line painting.
  • Moving and installation of updated airfield lighting and signage.

Challenges & Solutions:

The project required careful coordination of paving operations, stormwater improvements, and airfield lighting installations. By employing precise project management and skilled crews, Copcan ensured on-time delivery without disrupting airport operations.

Overall Impact:

Completed in September 2024, the apron expansion improves operational efficiency and safety at Castlegar Airport, supporting the City of Castlegar’s ongoing infrastructure upgrades.

Back to Top
  • About NorLand
  • Services
  • Projects
  • Contact Us
  • Careers
Privacy Policy
PO Terms & Conditions

© Copyright 2025 NorLand Limited

Site by Red Rocket Creative Strategies