6th Street Reconstruction Phase 1

6th Street Reconstruction Phase 1

  • 21 January 2025
  • by Kaelan

Scope of Work

Key components of the project included:

  • Road Reconstruction: Completed 2,100m² of full road reconstruction to enhance durability and driving conditions.
  • Water Infrastructure: Installed 180m of 150mm Ø C900 DR18 PVC watermain to modernize the water distribution system.
  • Stormwater Management: Installed 110m of 300mm Ø SDR35 storm piping, along with one 900mm Ø catch basin and two 1050mm Ø manholes, to improve drainage and mitigate flooding risks.
  • Curb and Sidewalk Installation: Installed 380m of mountable curb and gutter and 550m² of new sidewalk, enhancing pedestrian safety and accessibility.

Challenges & Solutions

  • Urban Construction Constraints: The project required careful planning to minimize disruptions in a residential area. Copcan employed phased construction techniques and clear communication with local residents to ensure smooth execution.
  • Drainage Improvements: Upgrading stormwater infrastructure was essential to address local flooding concerns. High-quality materials and efficient installation methods were used to ensure long-term reliability.
  • Traffic Management: Maintaining access for local traffic and pedestrians during construction posed a challenge. Comprehensive traffic and pedestrian management plans helped minimize inconvenience for residents and businesses.

Overall Impact

The 6th Street South Reconstruction project has significantly improved road and pedestrian infrastructure in Cranbrook. With upgraded water and storm systems and enhanced sidewalks, the project has increased safety, functionality, and accessibility for the community. Copcan Civil’s expertise in civil construction ensured the successful delivery of a high-quality project on time and on budget.

Cranbrook Lagoons – Berm Upgrades Phase 3

Cranbrook Lagoons – Berm Upgrades Phase 3

  • 8 January 2025
  • by Kaelan

Scope of Work:
Copcan Civil successfully executed the following key tasks:

  • Constructed temporary coffer dams to isolate lagoon cells, enabling the safe reconstruction of cell berms to new design standards.
  • Installed a new clay liner to reinforce the reconstructed berms, improving the structural integrity and water retention of the lagoon cells.
  • Applied riprap armoring along the berms adjacent to Joseph Creek, spanning from the start of Cell 1 to the end of Cell 3, to prevent erosion and protect the reconstructed berms.

Challenges & Solutions:

  1. Environmental Protection: The proximity to Joseph Creek required careful planning and adherence to environmental regulations. Copcan’s approach included temporary isolation measures and precise placement of riprap to safeguard the creek and surrounding habitat.
  2. Temporary Coffer Dams: Isolating the active lagoon cells was essential for maintaining water management during construction. Copcan employed engineered coffer dams to create dry work environments, ensuring construction could proceed without compromising lagoon operations.
  3. Berm Stability: Reconstructing berms with a new clay liner and riprap armoring required careful material selection and meticulous placement to achieve the design standards and ensure long-term durability.

The successful completion of Phase 3 in November 2024 marked a significant milestone for Cranbrook’s lagoon system, enhancing its resilience against erosion and improving water management capabilities for the city.

 

Cranbrook Lagoons Bypass Piping Phase 2

Cranbrook Lagoons Bypass Piping Phase 2

  • 8 January 20258 January 2025
  • by Kaelan
Back to Top
  • About NorLand
  • Services
  • Projects
  • Contact Us
  • Careers
Privacy Policy
PO Terms & Conditions

© Copyright 2025 NorLand Limited

Site by Red Rocket Creative Strategies