Southwest Rapid Transit

Southwest Rapid Transit

  • 18 June 202428 October 2024
  • by Ellie Elmi

The first phase involved two circular cast-in-place concrete cofferdams to act as wet wells for pump stations. This was followed by 10 – 1200mm diameter steel cased, rock socketed caissons to support a highway overpass. These steel casings were advanced up to 13.2 meters into bedrock. Extreme care and diligence was required as the work was performed directly adjacent to an active highway.

The final phase of the project involved a retaining wall made of both steel beam reinforced CIP soldier piles in various configurations as well as steel sheet piles.

Back to Top
  • About NorLand
  • Services
  • Projects
  • Contact Us
  • Careers
Privacy Policy
PO Terms & Conditions

© Copyright 2025 NorLand Limited

Site by Red Rocket Creative Strategies