
Musselwhite Mine Shaft Access
The vent plenum cofferdam was added to the design due to ground conditions being so unfavourable that excavation for construction was not feasible. Foundation piles were added into the structure’s shear walls to anchor them down. These were added to help with wind loading due to unsuitable ground conditions.