Nanaimo Fire Station Civil Works

Nanaimo Fire Station Civil Works

  • 8 January 20258 January 2025
  • by Karen Lawrence

Scope of Work:

All site works for the new fire hall included water, storm and sanitary utilities, building excavation, detailed footing excavation, trenching for mechanical and electrical, curb prep, sidewalk prep, and road gravels.

Challenges & Solutions:

The small footprint of the site made it a challenge working alongside numerous different subtrades. The existing fire station was located on the same property and had to remain in place throughout construction until the new building was ready for handover. Copcan completed all the site prep and utility work adjacent to the existing building while other trades were onsite such as pile drivers, electrical, mechanical and carpentry trades. Kinetic Construction, the general contractor, worked closely with Copcan’s superintendent to ensure effected communication and planning in advance so that trades were not tripping over each other.

Overall Impact:

Construction began in the fall of 2020 and the project was completed in April of 2023. All the civil works was completed on time and on budget. Very few changes/claims arose throughout construction as the design, general contracting and civil teams all worked together quite effectively mitigating challenges and identifying possible concerns ahead of time.

Back to Top
  • About NorLand
  • Services
  • Projects
  • Contact Us
  • Careers
Privacy Policy
PO Terms & Conditions

© Copyright 2025 NorLand Limited

Site by Red Rocket Creative Strategies