Musselwhite Mine Shaft Access

Musselwhite Mine Shaft Access

  • 18 June 202428 October 2024
  • by Ellie Elmi

The vent plenum cofferdam was added to the design due to ground conditions being so unfavourable that excavation for construction was not feasible. Foundation piles were added into the structure’s shear walls to anchor them down. These were added to help with wind loading due to unsuitable ground conditions.