Fairview Container Terminal Berth Expansion

Fairview Container Terminal Berth Expansion

  • 18 June 202428 October 2024
  • by Ellie Elmi

Scope of Work

CDI’s responsibilities included the installation of 63 epoxy-painted piles, each with a diameter of 914mm and a wall thickness of 19mm. These piles were to be seated into bedrock at a minimum depth of 1000mm, with rock sockets extending 7500mm. To prepare for this, carbide cutting teeth were welded onto the bottom of each casing, enabling the casings to core through overburden and bedrock effectively. Additionally, each pipe was notched to accept an over-sleeve, protecting the painted/coated piles during installation.

To ensure accurate pile placement, a series of guide frames/templates were pre-installed, each capable of supporting the installation of seven piles. These guide frames were sequentially repositioned along the pile line. The production piles were initially placed in the frames using a vibratory hammer, after which the DTH (down-the-hole) hammer and drill string were hoisted into position and secured.

CDI’s casing rotator was then employed, positioned over the pile containing the DTH hammer and pinned to the guide frame. An over-sleeve was hoisted over the permanent pile, lowered through the rotator, and engaged with drive notches. Utilizing the dual rotary drill system, CDI advanced the casing into bedrock while drilling out the inner diameter. Once the casing was sufficiently seated, the CDI top drive and DTH advanced the rock socket to a depth of 7.5m below the casing. After reaching the required depth, the drill steel was disconnected, and the equipment was transferred to the next casing. This meticulous process was repeated for all production piles.

Challenges & Solutions

The project encountered several technical challenges, primarily related to geotechnical issues and pile length discrepancies. CDI was called back to the site to address these problems, which included drilling out concrete in two land-based piles. To complete the remaining nine piles from the water, CDI mobilized their drilling equipment onto a marine derrick. This required careful coordination and the implementation of specialized marine drilling techniques to ensure stability and precision.

One of the significant technical challenges was working in unstable ground conditions, which led to multiple trench collapses. This not only posed safety risks but also affected constructability. CDI tackled these issues by reassessing project targets and scheduling daily, slowing down productivity when necessary to ensure the safety of the crew and manage unexpected conditions effectively.

Despite the challenges, CDI successfully completed the Fairview Container Terminal Berth Expansion project, significantly enhancing the terminal’s capacity and operational efficiency. Their ability to deliver high-quality, precise marine drilling and pile installation demonstrated CDI’s expertise and commitment to excellence. The project not only met but exceeded the client’s expectations, ensuring the terminal’s readiness to handle increased shipping demands. CDI’s innovative approach and problem-solving skills played a crucial role in overcoming the project’s difficulties, underscoring our status as a leading specialty foundation contractor.

Slew Bearing Replacement

Slew Bearing Replacement

  • 17 June 2024
  • by Ellie Elmi
Fairview Terminal Expansion

Fairview Terminal Expansion

  • 10 September 202320 September 2024
  • by main_admin

Scope of Work

BEL Contracting played a pivotal role in various aspects of the project, managing all landside scope including the expansion of the container stacking yard and new container storage yard.

  • Land Reclamation and Construction: BEL was responsible for the reclamation of 3 hectares of land at the north end of the terminal and expanding the container stacking yard. They executed massive excavation tasks and transformed the material into suitable fill for the new container yard.
  • Infrastructure and Utilities: The team extended its skills to construct essential utilities, including electrical setups, to enhance the terminal’s operational efficiency. This also ensures the terminal is ready for future technological upgrades, offering long-term value.
  • Traffic Management: The project also saw the addition of 70,000 m2 of road structure and paving to handle port traffic efficiently, ensuring smooth logistical flow within the facility. This is a testament to BEL’s comprehensive capacity for civil construction.
  • Specialized Construction: Among the project’s challenges was the construction of a unique flow collector chamber. This chamber required intricate planning to connect existing culverts to a newly installed box culvert. The operation had to be meticulously coordinated with tidal patterns and fluctuating weather conditions, showcasing BEL’s exceptional ability to handle complex engineering requirements.
  • Environmental and Safety Measures: Given the sensitive location near Prince Rupert Bay, BEL adhered to strict environmental regulations and safety protocols. Special care was taken during blasting activities conducted near existing critical infrastructure to ensure both environmental and operational safety.
  • Material Movement and Construction Methods: The project utilized various construction methods, including hydraulic drills for rock borrowing and cast-in-place techniques for manholes and foundation elements due to specific port loading requirements. Additionally, conveyors were used to move processed rock across the terminal’s main road and CN Rail mainline.
  • Operational Continuity: One of the remarkable aspects of this project was that it was accomplished without disrupting the existing port facility’s operations. The project’s tight schedule also required work to continue despite extreme weather conditions typical of the North Pacific Coast.

Through expert planning and execution, BEL Contracting proved its expertise in handling large-scale, environmentally sensitive, and operationally complex projects. Their role in the Fairview Phase II North project not only extended the terminal’s capacity but also set a new benchmark for construction projects in the maritime industry.

Back to Top
  • About NorLand
  • Services
  • Projects
  • Contact Us
  • Careers
Privacy Policy
PO Terms & Conditions

© Copyright 2025 NorLand Limited

Site by Red Rocket Creative Strategies