YVR Outlet Mall Foundations

YVR Outlet Mall Foundations

  • 17 June 2024
  • by Ellie Elmi
Longshore Training Facility

Longshore Training Facility

  • 18 June 20248 July 2024
  • by Ellie Elmi
Lulu Island – Swing Bridge Motor Replacement

Lulu Island – Swing Bridge Motor Replacement

  • 17 June 2024
  • by Ellie Elmi
Wharf Demolition

Wharf Demolition

  • 12 June 20243 October 2024
  • by Ellie Elmi
YVR North RESA 26R Earthworks & Utilities

YVR North RESA 26R Earthworks & Utilities

  • 10 September 202328 October 2024
  • by main_admin

Scope of Work

BEL Contracting’s role in the project spanned a range of activities:

  • Conducting major earthwork operations, BEL executed the large-scale excavation and placement of gravel to fortify the area. Special techniques were used to manage the low-lying location’s water levels effectively, enabling seamless construction.
  • The runway’s active taxiway surfaces were widened during scheduled nightly closures. This involved removing old materials and installing new compacted base gravels and drainage systems.
  • BEL successfully coordinated and installed new airfield lighting, adhering to stringent safety protocols and schedules to minimize disruption to ongoing airport operations.
  • A focus on environmental sustainability was maintained throughout, particularly given the project’s proximity to the Fraser River. Measures were taken to ensure that no environmental guidelines were breached.
  • The project required intricate coordination with YVR’s various subcontractors and operational teams. This was managed effectively through daily update and coordination meetings, ensuring everyone was aligned on construction progress and safety protocols.

The RESA project served as a testament to BEL Contracting’s capability to manage multifaceted, safety-critical construction projects. Through their careful planning and execution, BEL helped elevate the standards for airport construction while ensuring the project was completed within the set timeframe and environmental guidelines.

Back to Top
  • About NorLand
  • Services
  • Projects
  • Contact Us
  • Careers
Privacy Policy
PO Terms & Conditions

© Copyright 2025 NorLand Limited

Site by Red Rocket Creative Strategies