Red Mountain Resort – Caldera Phase 4
Scope of Work
Key components of the project included:
- Utility Installation:
- Constructed 260m of 150mm watermain.
- Installed 170m of 75mm sanitary force main.
- Installed 90m of 400mm CSP culvert with riprap-armoured headwalls for enhanced drainage and erosion control.
- Roadway and Driveway Construction:
- Built 2,650m² of roadway and driveway asphalt, supported by base and subbase aggregate layers.
- Excavation and Blasting:
- Performed rock blasting and Type D common excavation to prepare the site for development.
- Utility Infrastructure:
- Installed electrical and communication utilities to service the new subdivision.
Challenges & Solutions
- Mountainous Terrain: Working in Red Mountain’s challenging topography required advanced excavation techniques and precise rock blasting. Copcan’s experienced team ensured accurate and safe site preparation.
- Drainage and Erosion Control: Constructing culverts with riprap-armoured headwalls was critical to managing water flow and preventing erosion in the mountainous environment. Copcan uses high-quality materials and methods to ensure long-term performance.
- Community Integration: Developing a subdivision within a popular resort community demanded careful planning to minimize disruption to residents and visitors. Effective project management and clear communication kept stakeholders informed and satisfied throughout the process.
Overall Impact
Completing Caldera Phase 4 marks another step forward in Red Mountain Resort’s growth, providing modern, serviced lots for future development. The project’s high-quality infrastructure and environmental safeguards reflect Copcan Civil’s commitment to excellence, ensuring the subdivision meets the resort’s needs for years to come.