Skip to content
  • About Norland
    • About Norland
    • Health & Safety
    • Corporate Responsibility
    • NorLand News
  • Services
  • Projects
  • Contact Us
Facebook Instagram Linkedin
Careers
Site Search
  • About Norland
    • About Norland
    • Health & Safety
    • Corporate Responsibility
    • NorLand News
  • Services
  • Projects
  • Contact Us
Careers
Facebook Instagram Linkedin
150 Robson St Facade Retention

150 Robson St Facade Retention

  • 12 January 2026
  • by Alexandra Weirich

Scope of work 

This project required careful project management and close coordination between Pacific Demolition, BelPacific, and KWH Constructors to sequence demolition, excavation, and shoring around existing structure supports, dense buried utilities, and variable ground conditions. The teams worked together with project engineers to plan and execute each phase safely and efficiently. 

Historic Façade Support 

A key element of the project was preserving and stabilizing the building’s historic masonry façade throughout demolition and excavation. 

  • Planning and design of the façade retention system were completed in collaboration with KWH Constructors and project engineers to maintain façade integrity during all stages of construction. 
  • Steel façade retention frames and micropile supports were installed before demolition to hold the façade securely in place. 
  • Continuous monitoring and engineering reviews ensured that loads and movements remained within safe tolerances as demolition and excavation progressed. 
  • During foundation removal and excavation, the façade was temporarily supported on micropiles and monitored in real time while heavy structural elements beneath it were removed. 
  • Once excavation and shoring were completed, the façade supports were carefully dismantled in coordination with the construction of the new permanent structure. 

Building Demolition 

  • Hazardous materials abatement and complete building strip-out to expose the structural frame. 
  • Installation of building shoring and sawcut separation of the façade walls from the interior structure. 
  • Demolition of the interior structure section by section to avoid impacting the supported façade. 
  • Coordination with BelPacific for the safe removal of foundation elements during excavation. 

 

Excavation & Shoring 

  • Sequenced work with Pacific Demolition to remove the remaining parkade structure section by section. 
  • Excavation to a depth of 80 feet for a new underground parkade. 
  • Monitoring and protection of micropiles supporting the suspended façade during all drilling and anchoring work. 
  • Anchoring around dense buried utilities and existing façade support structures. 
  • Management of silty sand and glacial till at the excavation base and remediation of contaminated soils. 

Together, Pacific Demolition, BelPacific, and KWH Constructors executed a highly coordinated demolition, façade retention, and deep excavation operation, ensuring the safe preservation of the historic structure and the successful preparation of the site for redevelopment. 

Overall Impact 

Combining project management, demolition, excavation, and shoring expertise under Norland’s group of companies simplified coordination and minimized schedule risk.
  

Key outcomes 

  • Streamlined project management through shared planning and logistical support. 
  • Safe, on-schedule delivery of a technically demanding project in a congested urban setting. 

This project demonstrates how Norland’s integrated approach and experienced teams like Pacific Demolition and BelPacific help clients to execute large-scale, technically complex work safely and efficiently.  

Broadway Subway Project

Broadway Subway Project

  • 13 March 202320 December 2024
  • by main_admin

The project was a major provincial initiative which involved key stakeholders such as the City of Vancouver and Metro Vancouver for utility crossings. The expansion aimed to improve accessibility and connectivity within the city and the broader Metro Vancouver region, aiming to enhance transport options, reduce travel times, and boost economic development.

Scope of Work

NorLand’s contributions to the project included excavation and shoring at the Great Northern Way and Arbutus Stations, pre-excavation civil works, utility relocations, and the installation of a lower steel support structure for the traffic deck. Key divisions such as Pacific Demolition, BelPacific, and BEL Contracting brought their specialized skills to each phase of this complex endeavour.

Challenges & Solutions

The Broadway Subway Project required extensive coordination due to the excavation within a street alignment and proximity to multiple hydro crossings and significant Metro Vancouver water lines. Managing traffic flow added complexity, leading to the installation of a steel bridge structure to minimize disruptions. Permit requirements and space limitations necessitated detailed planning and communication, and NorLand maintained its commitment to meet timelines and budgets despite these challenges.

Overall Impact

By improving accessibility for Vancouver’s residents, workers, and visitors, the Broadway Subway Project aligned with NorLand’s commitment to building enduring communities and driving economic growth. NorLand’s collaborative approach and focus on safety and excellence were vital to overcoming obstacles and ensuring the project’s success, further solidifying its role in shaping Vancouver’s transportation infrastructure.

Pacific Demolition

Pacific Demolition

  • 4 April 20235 September 2025
  • by main_admin
Building Implosion

Building Implosion

  • 12 June 20243 October 2024
  • by Ellie Elmi

The famous revolving ‘W’ was also to be saved and be placed back on the new building. The ‘W’ sign was craned off the building, and the building was prepared for demolition’s greatest spectacle – Controlled Explosive Demolition. Extensive shoring was completed in the wood structure, and parts of the building were demolished conventionally to clear the way for the implosion.

Control Tower Demolition

Control Tower Demolition

  • 14 June 2024
  • by Ellie Elmi
Building & Tunnel Demolition

Building & Tunnel Demolition

  • 14 June 2024
  • by Ellie Elmi
Brick & Concrete Building Demolition

Brick & Concrete Building Demolition

  • 14 June 2024
  • by Ellie Elmi
Multi-Storey Concrete Building Demolition

Multi-Storey Concrete Building Demolition

  • 14 June 20243 October 2024
  • by Ellie Elmi
University Sciences Building Demolition

University Sciences Building Demolition

  • 14 June 2024
  • by Ellie Elmi
Post-Tensioned Concrete Building DemolitionPost-Tensioned Concrete Building Demolition

Post-Tensioned Concrete Building DemolitionPost-Tensioned Concrete Building Demolition

  • 14 June 2024
  • by Ellie Elmi

Posts pagination

1 2 3 4
Back to Top
  • About Norland
  • Services
  • Projects
  • Contact Us
Privacy Policy
PO Terms & Conditions

© Copyright 2026 Norland Limited

Facebook Instagram Linkedin
Site by Red Rocket Creative Strategies